Great Lakes and Carver will be developing the first U.S. The rock will be quarried locally, transported to the quayside on the Hudson River, and loaded onto Great Lakes’ rock installation vessel, the Acadia, which will sail to the wind farms to install the rock starting in 2025. Through this subcontract, Great Lakes will use rock produced in the State of New York to provide scour protection for offshore wind turbine foundations, and substations at Equinor (NYSE: EQNR) and bp’s (NYSE: bp) Empire Wind I and Empire Wind II wind farms. offshore wind farm with Carver Sand & Gravel LLC (“Carver”), a U.S. HOUSTON, J(GLOBE NEWSWIRE) - Great Lakes Dredge & Dock Corporation ("Great Lakes" or the “Company”) (NASDAQ: GLDD), the largest provider of dredging services in the United States, announced today the signing of the first ever subcontract for procurement of rock for a U.S.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |